IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
SIC 3612 Transformers, Except Electronic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0094 # 05 Y:2012 05 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,785 $30,700 Implemented
MZ0094 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $621 $0 Implemented
MZ0094 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,711 $27,900 Implemented
MZ0094 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,672 $3,000 Not Implemented
MZ0094 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,160 Implemented
AM0609 # 01 Y:2012 01 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $98,005 $5,200 Not Implemented
AM0609 # 02 Y:2012 02 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $37,900 $400 Not Implemented
AM0609 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,215 $2,000 Not Implemented
AM0609 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $24,800 $47,800 Not Implemented
AM0609 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,480 $23,500 Not Implemented
AM0609 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,600 $0 Not Implemented
AM0609 # 07 Y:2012 07 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,950 $500 Not Implemented
AM0609 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $40 Not Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented
NC0418 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,540 $37,837 Not Implemented
NC0418 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,535 $5,000 Implemented
NC0418 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $244,640 $566,702 Not Implemented
NC0418 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $202 $600 Not Implemented
NC0418 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $100 Implemented
NC0418 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $133 $567 Not Implemented
NC0418 # 07 Y:2011 07 2011 ADOPT IN-HOUSE MATERIAL GENERATION $5,969 $25,000 Not Implemented
TT0052 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,444 $3,000 Implemented
TT0052 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $15,000 Not Implemented
TT0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,000 $15,450 Not Implemented
TT0052 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,100 $7,000 Not Implemented