IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3612 Transformers, Except Electronic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0558 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $5,799 Implemented
LE0558 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,010 $1,600 Implemented
LE0558 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $2,000 Not Implemented
LE0558 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,840 $18,014 Implemented
LE0558 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,995 $37,000 Implemented
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
LE0558 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $1,400 Implemented
WV0419 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $528 Implemented
WV0419 # 03 Y:2010 03 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $27,845 $59,247 Not Implemented
WV0419 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,262 $161,162 Implemented
WV0419 # 01 Y:2010 01 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $80,000 $53,870 Not Implemented
WV0369 # 15 Y:2008 15 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,004 $87 Not Implemented
WV0369 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $108,677 $0 Implemented
WV0369 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $77,536 $198,000 Not Implemented
WV0369 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $48,102 $41,400 Implemented
WV0369 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,982 $71,794 Implemented
WV0369 # 20 Y:2008 20 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $389 $470 Implemented
WV0369 # 19 Y:2008 19 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $563 $585 Implemented
WV0369 # 18 Y:2008 18 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $819 $1,484 Not Implemented
WV0369 # 17 Y:2008 17 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $835 $0 Implemented
WV0369 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,266 $114 Implemented
WV0369 # 05 Y:2008 05 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,912 $8,070 Not Implemented
WV0369 # 14 Y:2008 14 2008 INSULATE BARE EQUIPMENT $2,008 $1,241 Implemented
WV0369 # 13 Y:2008 13 2008 DEVELOP A REPAIR/REPLACE POLICY $2,047 $776 Implemented
WV0369 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,264 $2,000 Implemented