Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3612 | Transformers, Except Electronic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0689 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $0 | Not Implemented |
TN0689 # 08 Y:2000 | 08 | 2000 | ADD AREA LIGHTING SWITCHES | $3,620 | $6,160 | Implemented |
TN0689 # 07 Y:2000 | 07 | 2000 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $4,345 | $300 | Implemented |
TN0689 # 06 Y:2000 | 06 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $6,220 | $0 | Not Implemented |
TN0689 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,460 | $19,500 | Not Implemented |
TN0689 # 04 Y:2000 | 04 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,245 | $5,625 | Implemented |
TN0689 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,180 | $18,900 | Not Implemented |
TN0689 # 02 Y:2000 | 02 | 2000 | ELIMINATE/REDUCE AN OPERATION | $35,890 | $108,460 | Not Implemented |
TN0689 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $97,005 | $100,000 | Implemented |
TN0687 # 05 Y:2000 | 05 | 2000 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,280 | $2,925 | Not Implemented |
TN0687 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $720 | $0 | Implemented |
TN0687 # 09 Y:2000 | 09 | 2000 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $893 | $2,950 | Not Implemented |
TN0687 # 08 Y:2000 | 08 | 2000 | INSULATE BARE EQUIPMENT | $1,562 | $188 | Not Implemented |
TN0687 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,680 | $350 | Implemented |
TN0687 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,289 | $2,150 | Implemented |
TN0687 # 04 Y:2000 | 04 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,210 | $820 | Implemented |
TN0687 # 03 Y:2000 | 03 | 2000 | TREAT AND REUSE RINSE WATERS | $6,496 | $14,340 | Not Implemented |
TN0687 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,703 | $750 | Implemented |
TN0687 # 01 Y:2000 | 01 | 2000 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $25,255 | $1,075 | Implemented |
SF0185 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,221 | $0 | Implemented |
SF0185 # 10 Y:2000 | 10 | 2000 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $27,650 | $130,000 | Not Implemented |
SF0185 # 09 Y:2000 | 09 | 2000 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $27,526 | $28,000 | Not Implemented |
SF0185 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,600 | $89,000 | Not Implemented |
SF0185 # 07 Y:2000 | 07 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $848 | $0 | Not Implemented |
SF0185 # 06 Y:2000 | 06 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,818 | $0 | Implemented |