Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
386
matching recommendationsSIC | 3613 | Switchgear And Switchboard Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0157 # 09 Y:1999 | 09 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $3,193 | $0 | Implemented |
TN0651 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $23,000 | $21,000 | Not Implemented |
TN0651 # 02 Y:1999 | 02 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $9,040 | $9,140 | Implemented |
TN0651 # 03 Y:1999 | 03 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,840 | $8,000 | Not Implemented |
TN0651 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $3,020 | $1,605 | Implemented |
TN0651 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,625 | $900 | Not Implemented |
TN0651 # 06 Y:1999 | 06 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $1,465 | $2,420 | Not Implemented |
TN0651 # 07 Y:1999 | 07 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $880 | $1,120 | Not Implemented |
WV0156 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,548 | $144 | Implemented |
WV0156 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $732 | $671 | Implemented |
WV0156 # 01 Y:1999 | 01 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,572 | $15,591 | Not Implemented |
WV0156 # 02 Y:1999 | 02 | 1999 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,158 | $672 | Implemented |
WV0156 # 03 Y:1999 | 03 | 1999 | BURN A LESS EXPENSIVE GRADE OF FUEL | $4,324 | $4,800 | Not Implemented |
WV0156 # 04 Y:1999 | 04 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $7,399 | $1,876 | Implemented |
WV0156 # 15 Y:1999 | 15 | 1999 | CLEAR AND RENT EXISTING SPACE | $56,250 | $4,800 | Not Implemented |
WV0156 # 14 Y:1999 | 14 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $4,667 | $260 | Not Implemented |
WV0156 # 13 Y:1999 | 13 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $600 | $42 | Implemented |
WV0156 # 12 Y:1999 | 12 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $560 | $0 | Implemented |
WV0156 # 11 Y:1999 | 11 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,852 | $3,756 | Not Implemented |
WV0156 # 10 Y:1999 | 10 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,638 | $23 | Implemented |
WV0156 # 09 Y:1999 | 09 | 1999 | REPLACE BOILER | $2,866 | $49,515 | Not Implemented |
WV0156 # 08 Y:1999 | 08 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,888 | $4,000 | Not Implemented |
WV0156 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,743 | $60 | Implemented |
OK0561 # 01 Y:1998 | 01 | 1998 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,306 | $5,000 | Implemented |
OK0561 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $588 | $1,039 | Implemented |