IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

551

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2312 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,419 $15,000 Implemented
UL2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,620 Implemented
UL2312 # 01 Y:2023 01 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $5,925 $0 Implemented
UL2312 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Implemented
UC2306 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $375 $0 Implemented
UC2306 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,153 $34,274 Implemented
UC2306 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $11,635 Implemented
UU0218 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $512 $161 Implemented
UU0218 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,404 $5,700 Implemented
UU0218 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $53,198 Implemented
UU0218 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,861 $721 Implemented
SU0521 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,226 $380 Implemented
SU0521 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,254 $800 Implemented
SU0521 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,111 $0 Implemented
SU0521 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,147 $0 Implemented
SU0521 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $40 $0 Implemented
SU0521 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,565 $0 Implemented
LE0502 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,768 $200 Implemented
LE0502 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,993 $17,900 Implemented
LE0502 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $1,800 Implemented
LE0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,020 $17,500 Implemented
OK1025 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,684 $2,420 Implemented
OK1025 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $5,805 $65 Implemented
OK1025 # 01 Y:2020 01 2020 USE RADIANT HEATER FOR SPOT HEATING $34,672 $127,500 Implemented
OK1025 # 04 Y:2020 04 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,427 $1,500 Implemented