IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0252 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,478 $32,500 Implemented
MZ0252 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,159 $0 Implemented
MZ0252 # 01 Y:2018 01 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $4,011 $540 Implemented
MZ0252 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $50 Implemented
MZ0252 # 05 Y:2018 05 2018 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $65,281 $50,000 Implemented
MZ0162 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $537 $2,680 Implemented
MZ0162 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,287 $16,804 Implemented
MZ0157 # 02 Y:2014 02 2014 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,077 $10,750 Implemented
MZ0157 # 05 Y:2014 05 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,840 $9,600 Implemented
MZ0157 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,149 $30,133 Implemented
MZ0130 # 03 Y:2013 03 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $17,041 $5,200 Implemented
MZ0130 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,164 $1,000 Implemented
MZ0130 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,911 $36,015 Implemented
MO0231 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,947 $5,800 Implemented
MO0231 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $990 $1,872 Implemented
MO0231 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented
MO0151 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,472 $15,370 Implemented
KU0446 # 14 Y:1994 14 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $540 Implemented
KU0446 # 13 Y:1994 13 1994 INSTALL OCCUPANCY SENSORS $1,170 $1,540 Implemented
KU0446 # 12 Y:1994 12 1994 INSTALL SKYLIGHTS $3,223 $4,920 Implemented
KU0446 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,584 $12,960 Implemented
KU0446 # 10 Y:1994 10 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $504 $10 Implemented
KU0446 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $191 Implemented
KU0446 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $965 $1,197 Implemented
KU0446 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,279 $240 Implemented