Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2312 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,666 | $224,516 | Not Implemented |
UL2312 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $167 | $488 | Not Implemented |
UL2312 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $1,620 | Implemented |
UL2312 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $450 | $0 | Implemented |
UL2312 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,419 | $15,000 | Implemented |
UL2312 # 01 Y:2023 | 01 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,925 | $0 | Implemented |
UL2312 # 07 Y:2023 | 07 | 2023 | SHADE WINDOWS FROM SUMMER SUN | $7,159 | $34,500 | Not Implemented |
UK2105 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,578 | $0 | n/a |
UK2105 # 11 Y:2021 | 11 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,807 | $400 | n/a |
UK2105 # 09 Y:2021 | 09 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,619 | $644 | n/a |
UK2105 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $701 | $0 | n/a |
UK2105 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,309 | $2,702 | n/a |
UK2105 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $1,049 | $994 | n/a |
UK2105 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $185 | $332 | n/a |
UK2105 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $748 | $540 | n/a |
UK2105 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,473 | $3,200 | n/a |
UK2105 # 08 Y:2021 | 08 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,440 | $1,484 | n/a |
UK2105 # 10 Y:2021 | 10 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,248 | $1,000 | n/a |
UK1315 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,356 | $52,000 | Not Implemented |
UK1315 # 08 Y:2013 | 08 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,395 | $1,200 | Not Implemented |
UK1315 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,766 | $2,000 | Implemented |
UK1315 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $261 | $0 | Implemented |
UK1315 # 04 Y:2013 | 04 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $633 | $0 | Implemented |
UK1315 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,528 | $0 | Implemented |
UK1315 # 02 Y:2013 | 02 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $943 | $2,750 | Not Implemented |