IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0306 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,901 $337 Implemented
SU0306 # 05 Y:2011 05 2011 RECOVER AND REUSE COOLING WATER $32,137 $12,052 Implemented
SU0306 # 06 Y:2011 06 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,700 $35,000 Not Implemented
SU0306 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $8,914 $55,516 Not Implemented
IC0175 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,695 $76 Not Implemented
IC0175 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $867 $627 Not Implemented
IC0175 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $9,779 $2,404 Not Implemented
IC0175 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,765 $1,956 Not Implemented
IC0175 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $991 $0 Not Implemented
AM0571 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $34,630 $98,400 Not Implemented
AM0571 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,740 $2,160 Not Implemented
AM0571 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,200 $300 Implemented
AM0571 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,010 $31,300 Implemented
AM0571 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $1,500 Implemented
AM0571 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $1,900 Implemented
AM0571 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,605 $0 Implemented
AM0571 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $1,500 Implemented
SU0286 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,756 $0 Implemented
SU0286 # 02 Y:2009 02 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,876 $0 Not Implemented
SU0286 # 03 Y:2009 03 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,389 $0 Not Implemented
SU0286 # 04 Y:2009 04 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,215 $0 Implemented
SU0286 # 05 Y:2009 05 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,974 $0 Not Implemented
SU0286 # 06 Y:2009 06 2009 DISCONNECT BALLASTS $1,462 $0 Not Implemented
SU0286 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $287 Implemented
SU0286 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $400 $457 Not Implemented