Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0692 # 02 Y:2000 | 02 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $899,000 | $967,000 | Implemented |
NC0099 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,927 | $200 | n/a |
NC0099 # 04 Y:1996 | 04 | 1996 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $289 | $10 | n/a |
NC0099 # 03 Y:1996 | 03 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $201 | $40 | n/a |
NC0099 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,237 | $27,552 | n/a |
NC0099 # 01 Y:1996 | 01 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,822 | $7,500 | n/a |
NC0099 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,592 | $390 | n/a |
NC0099 # 07 Y:1996 | 07 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,397 | $1,600 | n/a |
NC0099 # 08 Y:1996 | 08 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $31,584 | $66,000 | n/a |
NC0049 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,182 | $1,290 | Implemented |
NC0049 # 10 Y:1995 | 10 | 1995 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $10,722 | $2,115 | Not Implemented |
NC0049 # 02 Y:1995 | 02 | 1995 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,275 | $180,000 | Not Implemented |
NC0049 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,443 | $8,000 | Not Implemented |
NC0049 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,293 | $432 | Not Implemented |
NC0049 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $1,245 | $3,600 | Not Implemented |
NC0049 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,915 | $2,000 | Implemented |
NC0049 # 07 Y:1995 | 07 | 1995 | ADD AREA LIGHTING SWITCHES | $478 | $1,200 | Not Implemented |
NC0049 # 08 Y:1995 | 08 | 1995 | REDUCE GLAZED AREAS IN BUILDINGS | $5,285 | $1,400 | Implemented |
NC0049 # 09 Y:1995 | 09 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,233 | $4,000 | Not Implemented |
NC0028 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $153 | $250 | Implemented |
NC0028 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $600 | Implemented |
NC0028 # 03 Y:1994 | 03 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $787 | $240 | Not Implemented |
NC0028 # 04 Y:1994 | 04 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $736 | $1,510 | Implemented |
NC0028 # 05 Y:1994 | 05 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,525 | $7,000 | Not Implemented |
TN0513 # 01 Y:1994 | 01 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $7,632 | $3,500 | Not Implemented |