Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0562 # 05 Y:1999 | 05 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $5,340 | $4,000 | Not Implemented |
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
UD0562 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,200 | $4,000 | Not Implemented |
UD0562 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $10,130 | $0 | Implemented |
UD0562 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,767 | $10,000 | Not Implemented |
UD0558 # 01 Y:1998 | 01 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,790 | $8,000 | Implemented |
UD0558 # 04 Y:1998 | 04 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,453 | $8,000 | Implemented |
UD0558 # 03 Y:1998 | 03 | 1998 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $7,068 | $7,600 | Not Implemented |
UD0558 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,343 | $45,360 | Implemented |
UD0558 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,200 | $0 | Implemented |
UD0378 # 04 Y:1992 | 04 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,114 | $14,400 | Implemented |
UD0378 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,357 | $0 | Not Implemented |
UD0378 # 02 Y:1992 | 02 | 1992 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,650 | $0 | Not Implemented |
UD0378 # 01 Y:1992 | 01 | 1992 | INSTALL SET-BACK TIMERS | $23,156 | $0 | Not Implemented |
UD0367 # 01 Y:1992 | 01 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $727 | $0 | Not Implemented |
UD0367 # 02 Y:1992 | 02 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,207 | $400 | Not Implemented |
UD0367 # 03 Y:1992 | 03 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $4,588 | $1,800 | Not Implemented |
UD0039 # 05 Y:1982 | 05 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,253 | $7,000 | Implemented |
UD0039 # 04 Y:1982 | 04 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,302 | $13,500 | Implemented |
UD0039 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $357 | $300 | Implemented |
UD0039 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $480 | $0 | Implemented |
UD0039 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,698 | $1,557 | Implemented |
UD0031 # 04 Y:1982 | 04 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,678 | $1,000 | Not Implemented |
UD0031 # 03 Y:1982 | 03 | 1982 | REDUCE VENTILATION AIR | $2,422 | $40 | Not Implemented |
UD0031 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $256 | $0 | Implemented |