IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0005 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,759 $11 Not Implemented
MI0005 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,110 $423 Not Implemented
MI0005 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,655 $3,000 Not Implemented
MI0005 # 05 Y:2001 05 2001 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $149,887 $23,328 Not Implemented
MI0005 # 06 Y:2001 06 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,430 $11,232 Not Implemented
TA0001 # 01 Y:2001 01 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,240 $0 Not Implemented
TA0001 # 02 Y:2001 02 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,219 $4,918 Not Implemented
TA0001 # 03 Y:2001 03 2001 USE RADIANT HEATER FOR SPOT HEATING $2,125 $417 Not Implemented
TA0001 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $275 Implemented
TA0001 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $447 $0 Implemented
TA0001 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $178 $221 Not Implemented
KU0545 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $12,740 $4,370 Implemented
KU0545 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $15,470 Implemented
KU0545 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,890 $20 Implemented
KU0545 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,150 Implemented
KU0545 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,510 $1,770 Implemented
KU0545 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,450 $4,000 Implemented
KU0545 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,020 $0 Implemented
KU0545 # 08 Y:2000 08 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,600 $11,400 Not Implemented
KU0545 # 09 Y:2000 09 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,530 $3,000 Not Implemented
TN0692 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $3,613,000 $645,000 Not Implemented
TN0692 # 02 Y:2000 02 2000 ADD ADDITIONAL PRODUCTION SHIFT $899,000 $967,000 Implemented
TN0692 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $700 Not Implemented
TN0692 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,220 $11,900 Not Implemented
TN0692 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $4,210 $0 Implemented