IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0251 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $910 $100 Implemented
MO0251 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,713 $3,862 Implemented
MO0251 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $15,502 $17,960 Implemented
ME0261 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,284 $80,602 Implemented
ME0261 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,535 $25,000 Implemented
ME0261 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,477 $7,909 Implemented
ME0261 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,134 $900 Implemented
ME0261 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,914 $11,200 Not Implemented
ME0261 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,704 $12,000 Implemented
ME0261 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,394 $3,080 Implemented
ME0261 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $1,053 $1,200 Implemented
ME0261 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $886 $200 Implemented
ME0261 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $788 $500 Implemented
ME0261 # 11 Y:1999 11 1999 DEVELOP A REPAIR/REPLACE POLICY $271 $325 Implemented
ME0261 # 12 Y:1999 12 1999 $29 $27 Implemented
UD0562 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,767 $10,000 Not Implemented
UD0562 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $10,130 $0 Implemented
UD0562 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,200 $4,000 Not Implemented
UD0562 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,677 $1,040 Implemented
UD0562 # 05 Y:1999 05 1999 FILTER AND REUSE HYDRAULIC OIL $5,340 $4,000 Not Implemented
UD0562 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,976 $13,500 Not Implemented
UD0562 # 07 Y:1999 07 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,344 $4,000 Not Implemented
UD0562 # 08 Y:1999 08 1999 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,041 $3,000 Not Implemented
UM0129 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,119 $13,195 Not Implemented
UM0129 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,707 $23,612 Not Implemented