Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,323
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0129 # 03 Y:1999 | 03 | 1999 | REPLACE BOILER | $78,528 | $13,800 | Not Implemented |
UM0129 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,159 | $17,000 | Not Implemented |
UM0129 # 05 Y:1999 | 05 | 1999 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $56,391 | $122,400 | Not Implemented |
UM0129 # 06 Y:1999 | 06 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $3,463 | $19,860 | Not Implemented |
UL0209 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,561 | $2,000 | Not Implemented |
UL0209 # 02 Y:1998 | 02 | 1998 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,743 | $0 | Not Implemented |
UL0209 # 03 Y:1998 | 03 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,173 | $0 | Implemented |
UL0209 # 04 Y:1998 | 04 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,442 | $0 | Not Implemented |
UL0209 # 05 Y:1998 | 05 | 1998 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $4,330 | $78 | Implemented |
UD0558 # 01 Y:1998 | 01 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,790 | $8,000 | Implemented |
UD0558 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,343 | $45,360 | Implemented |
UD0558 # 03 Y:1998 | 03 | 1998 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $7,068 | $7,600 | Not Implemented |
UD0558 # 04 Y:1998 | 04 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,453 | $8,000 | Implemented |
UD0558 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,200 | $0 | Implemented |
MO0231 # 01 Y:1998 | 01 | 1998 | EXPAND OPERATIONS INTO UNUSED SPACE | $26,666 | $55,772 | Not Implemented |
MO0231 # 02 Y:1998 | 02 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $7,800 | $3,800 | Not Implemented |
MO0231 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $631 | $898 | Not Implemented |
MO0231 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $207 | Not Implemented |
MO0231 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $90 | Not Implemented |
MO0231 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,184 | $80 | Not Implemented |
MO0231 # 07 Y:1998 | 07 | 1998 | USE SYNTHETIC LUBRICANT | $261 | $178 | Not Implemented |
MO0231 # 08 Y:1998 | 08 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $990 | $1,872 | Implemented |
MO0231 # 09 Y:1998 | 09 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $205 | $0 | Implemented |
MO0231 # 10 Y:1998 | 10 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,947 | $5,800 | Implemented |
MS0107 # 01 Y:1998 | 01 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,339 | $2,000 | Implemented |