IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,323

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0107 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,380 $718 Not Implemented
MS0107 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,719 $3,248 Implemented
MS0107 # 04 Y:1998 04 1998 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $96,541 $13,936 Implemented
MS0107 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,757 $20,202 Implemented
MS0107 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $3,239 $761 Not Implemented
MS0107 # 07 Y:1998 07 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,237 $0 Implemented
MS0107 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,327 $1,690 Not Implemented
MS0107 # 09 Y:1998 09 1998 CONDENSE OPERATION INTO ONE BUILDING $187,809 $34,932 Implemented
HO0173 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,124 $17,821 Not Implemented
HO0173 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,569 Not Implemented
HO0173 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,033 $120 Not Implemented
HO0173 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $2,983 $600 Not Implemented
HO0173 # 05 Y:1998 05 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $648 $1,073 Not Implemented
HO0173 # 06 Y:1998 06 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $492 $1,214 Not Implemented
HO0173 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,478 $500 Not Implemented
HO0173 # 08 Y:1998 08 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,788 $500 Not Implemented
HO0173 # 09 Y:1998 09 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,463 $0 Not Implemented
WI0316 # 01 Y:1998 01 1998 ELIMINATE SHIFT $36,000 $40,000 Not Implemented
WI0316 # 02 Y:1998 02 1998 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $15,330 $46,000 Not Implemented
WI0316 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,476 $30,250 Not Implemented
WI0316 # 04 Y:1998 04 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $6,566 $0 Implemented
WI0316 # 05 Y:1998 05 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $3,025 $10,000 Not Implemented
WI0316 # 06 Y:1998 06 1998 TREAT AND REUSE RINSE WATERS $931 $1,475 Not Implemented
DS0103 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $3,332 $2,000 Implemented
DS0103 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $625 Implemented