Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0826 # 07 Y:2012 | 07 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $20,532 | $9,400 | Not Implemented |
OK0826 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $13,280 | $31,040 | Not Implemented |
OK0826 # 04 Y:2012 | 04 | 2012 | COVER OPEN TANKS | $1,576 | $0 | Not Implemented |
OK0826 # 06 Y:2012 | 06 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,630 | $4,000 | Not Implemented |
OK0826 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,061 | $38,900 | Not Implemented |
OK0826 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,910 | $106,879 | Not Implemented |
OK0826 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,497 | $27,016 | Not Implemented |
OK0770 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,297 | $0 | Implemented |
OK0770 # 07 Y:2008 | 07 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,527 | $0 | Implemented |
OK0770 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,014 | $5,534 | Not Implemented |
OK0770 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $669 | $1,056 | Implemented |
OK0770 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,597 | $0 | Implemented |
OK0770 # 06 Y:2008 | 06 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,894 | $1,346 | Not Implemented |
OK0770 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,686 | $17,885 | Implemented |
OK0736 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,322 | $1,267 | Implemented |
OK0736 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $29,250 | $20,340 | Implemented |
OK0736 # 02 Y:2006 | 02 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $447,023 | $299,500 | Not Implemented |
OK0736 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $224,746 | $154,440 | Implemented |
OK0736 # 06 Y:2006 | 06 | 2006 | USE PHOTOCELL CONTROLS | $3,268 | $225 | Not Implemented |
OK0736 # 04 Y:2006 | 04 | 2006 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,438 | $765 | Implemented |
AR0125 # 10 Y:1997 | 10 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,700 | $1,000 | Not Implemented |
AR0125 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $200 | $229 | Not Implemented |
AR0125 # 04 Y:1997 | 04 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $265 | $0 | Not Implemented |
AR0125 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,152 | $150 | Implemented |
AR0125 # 06 Y:1997 | 06 | 1997 | OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS | $89 | $0 | Not Implemented |