Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2414 # 06 Y:2024 | 06 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $71,333 | $21,308 | n/a |
UL2414 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,205 | $15,000 | n/a |
UL2414 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,526 | $1,500 | n/a |
UL2414 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,785 | $1,075,553 | n/a |
UL2414 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $5,637 | $7,818 | n/a |
UL2414 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,855 | $3,045 | n/a |
UL2312 # 01 Y:2023 | 01 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,925 | $0 | Implemented |
UL2312 # 07 Y:2023 | 07 | 2023 | SHADE WINDOWS FROM SUMMER SUN | $7,159 | $34,500 | Not Implemented |
UL2312 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,419 | $15,000 | Implemented |
UL2312 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $450 | $0 | Implemented |
UL2312 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $167 | $488 | Not Implemented |
UL2312 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,666 | $224,516 | Not Implemented |
UL2312 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $1,620 | Implemented |
UK2105 # 11 Y:2021 | 11 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,807 | $400 | n/a |
UK2105 # 10 Y:2021 | 10 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,248 | $1,000 | n/a |
UK2105 # 09 Y:2021 | 09 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,619 | $644 | n/a |
UK2105 # 08 Y:2021 | 08 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,440 | $1,484 | n/a |
UK2105 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,473 | $3,200 | n/a |
UK2105 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $748 | $540 | n/a |
UK2105 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $185 | $332 | n/a |
UK2105 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $1,049 | $994 | n/a |
UK2105 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,309 | $2,702 | n/a |
UK2105 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,578 | $0 | n/a |
UK2105 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $701 | $0 | n/a |
UK1315 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,766 | $2,000 | Implemented |