IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0151 # 01 Y:1995 01 1995 USE RADIANT HEATER FOR SPOT HEATING $27,601 $17,901 Not Implemented
MO0151 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,472 $15,370 Implemented
MO0151 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $25 Not Implemented
MO0151 # 05 Y:1995 05 1995 USE PLASTIC PALLETS INSTEAD OF WOOD $38,520 $36,113 Not Implemented
MO0151 # 04 Y:1995 04 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,918 $2,845 Not Implemented
KU0446 # 14 Y:1994 14 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $540 Implemented
KU0446 # 01 Y:1994 01 1994 CONVERT TO ELECTROSTATIC POWDER COATING $38,324 $12,000 Not Implemented
KU0446 # 13 Y:1994 13 1994 INSTALL OCCUPANCY SENSORS $1,170 $1,540 Implemented
KU0446 # 12 Y:1994 12 1994 INSTALL SKYLIGHTS $3,223 $4,920 Implemented
KU0446 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,584 $12,960 Implemented
KU0446 # 10 Y:1994 10 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $504 $10 Implemented
KU0446 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $191 Implemented
KU0446 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $965 $1,197 Implemented
KU0446 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $801 $150 Not Implemented
KU0446 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,279 $240 Implemented
KU0446 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $10 Not Implemented
KU0446 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,291 $300 Implemented
KU0446 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,601 $1,600 Not Implemented
KU0446 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,466 $2,616 Not Implemented
MO0105 # 10 Y:1993 10 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $334 $20 Implemented
MO0105 # 03 Y:1993 03 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $204 $0 Implemented
MO0105 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,346 $777 Implemented
MO0105 # 01 Y:1993 01 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $67,868 $8,774 Not Implemented
MO0105 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $1,024 Implemented
MO0105 # 04 Y:1993 04 1993 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $43,359 $7,325 Not Implemented