IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0514 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,361 $688 Implemented
WV0514 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,663 $0 Implemented
WV0514 # 09 Y:2015 09 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $530 $2,104 Not Implemented
WV0514 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $842 $50 Implemented
WV0514 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,005 $256 Implemented
WV0514 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,286 $11,500 Not Implemented
WV0514 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,756 $420 Implemented
WV0514 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,801 $15,300 Not Implemented
WV0514 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $3,646 $5,000 Not Implemented
UD0672 # 09 Y:2003 09 2003 UPGRADE CONTROLS ON COMPRESSORS $495 $0 Not Implemented
UD0672 # 13 Y:2003 13 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47 $3 Implemented
UD0672 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $218 Implemented
UD0672 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $867 $0 Not Implemented
UD0672 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $963 $323 Implemented
UD0672 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $143 Implemented
UD0672 # 10 Y:2003 10 2003 INSTALL OCCUPANCY SENSORS $371 $220 Not Implemented
UD0672 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,720 $0 Not Implemented
UD0672 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,100 $136 Implemented
UD0672 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,363 $14,700 Not Implemented
UD0672 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,766 $0 Implemented
UD0672 # 11 Y:2003 11 2003 ADD AREA LIGHTING SWITCHES $264 $640 Implemented
UD0672 # 12 Y:2003 12 2003 INSULATE BARE EQUIPMENT $140 $0 Not Implemented
UD0562 # 07 Y:1999 07 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,344 $4,000 Not Implemented
UD0562 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,976 $13,500 Not Implemented
UD0562 # 05 Y:1999 05 1999 FILTER AND REUSE HYDRAULIC OIL $5,340 $4,000 Not Implemented