Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsSIC | 363 | Household Appliances |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0071 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,700 | $5 | Implemented |
TT0071 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,100 | $66,100 | Implemented |
TT0071 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,400 | $52,100 | Implemented |
TT0034 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,400 | $0 | Implemented |
TT0034 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,900 | $800 | Implemented |
TT0034 # 07 Y:2009 | 07 | 2009 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,000 | $0 | Implemented |
TN0643 # 06 Y:1998 | 06 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $6,200 | $0 | Implemented |
TN0643 # 05 Y:1998 | 05 | 1998 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,600 | $0 | Implemented |
TN0643 # 04 Y:1998 | 04 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $12,000 | $0 | Implemented |
TN0643 # 03 Y:1998 | 03 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $19,290 | $4,800 | Implemented |
TN0643 # 01 Y:1998 | 01 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $219,500 | $24,000 | Implemented |
TN0595 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $9,770 | $5,400 | Implemented |
TN0595 # 07 Y:1996 | 07 | 1996 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $2,600 | $0 | Implemented |
TN0595 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,230 | $7,525 | Implemented |
TN0595 # 01 Y:1996 | 01 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $34,060 | $12,880 | Implemented |
TN0589 # 02 Y:1996 | 02 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,430 | $2,280 | Implemented |
TN0422 # 05 Y:1991 | 05 | 1991 | USE COMPRESSOR AIR FILTERS | $4,744 | $25 | Implemented |
TN0422 # 01 Y:1991 | 01 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $49,720 | $23,800 | Implemented |
TN0422 # 07 Y:1991 | 07 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,708 | $345 | Implemented |
TN0422 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,798 | $1,130 | Implemented |