IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0577 # 02 Y:2016 02 2016 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $11,227 $15,000 Not Implemented
NC0577 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,300 $135,630 Not Implemented
NC0577 # 09 Y:2016 09 2016 TREAT AND REUSE RINSE WATERS $5,659 $7,720 Not Implemented
NC0577 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $106 $200 Not Implemented
NC0577 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $168 $799 Not Implemented
NC0577 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,793 $2,000 Not Implemented
NC0577 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,896 $100 Not Implemented
NC0577 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,088 $3,600 Not Implemented
NC0577 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $100 Not Implemented
WV0289 # 15 Y:2004 15 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,365 $0 Implemented
WV0289 # 14 Y:2004 14 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,227 $1,631 Implemented
WV0289 # 13 Y:2004 13 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,628 $1,119 Not Implemented
WV0289 # 12 Y:2004 12 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,170 $103 Implemented
WV0289 # 05 Y:2004 05 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,230 $1,687 Implemented
WV0289 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,432 $3,500 Not Implemented
WV0289 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,879 $511 Not Implemented
WV0289 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,993 $250 Implemented
WV0289 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $3,010 $5,938 Not Implemented
WV0289 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,340 $127 Implemented
WV0289 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,338 $19,000 Not Implemented
WV0289 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $9,956 $2,109 Implemented
WV0289 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,600 $4,857 Implemented
WV0289 # 02 Y:2004 02 2004 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $16,901 $11,831 Not Implemented
WV0289 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $46,305 $117,949 Not Implemented
NC0153 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $541 $800 Not Implemented