Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsSIC | 3643 | Current-carrying Wiring Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2312 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,286 | $62,649 | Implemented |
KS2312 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,944 | $5,480 | Implemented |
KS2312 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,204 | $0 | Implemented |
KS2312 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,360 | $1,600 | Implemented |
WV0637 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,462 | $188 | Implemented |
WV0637 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,065 | $3,353 | Implemented |
WV0637 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $164 | $483 | Implemented |
WV0637 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $678 | $50 | Implemented |
WV0637 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $122 | $600 | Implemented |
WV0637 # 06 Y:2023 | 06 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $502 | $617 | Implemented |
MU0007 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,417 | $10,160 | Implemented |
MU0007 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,004 | $0 | Implemented |
MU0007 # 06 Y:2022 | 06 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $12 | $44 | Implemented |
MU0007 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,914 | $0 | Implemented |
MA0824 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,177 | $29,750 | Implemented |
MA0824 # 05 Y:2020 | 05 | 2020 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,491 | $6,300 | Implemented |
MA0824 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,118 | $7,710 | Implemented |
OK1029 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,684 | $22,100 | Implemented |
OK1029 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,568 | $2,250 | Implemented |
OK1029 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,197 | $30,672 | Implemented |
LE0483 # 01 Y:2019 | 01 | 2019 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $200 | $40 | Implemented |
LE0483 # 05 Y:2019 | 05 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,574 | $20,000 | Implemented |
MI0357 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $18,306 | $3,600 | Implemented |
MI0357 # 07 Y:2019 | 07 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,267 | $1,195 | Implemented |
MI0357 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,575 | $160 | Implemented |