IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
SIC 3643 Current-carrying Wiring Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0094 # 07 Y:2004 07 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,093 $2,056 Implemented
MI0094 # 08 Y:2004 08 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $69,699 $5,966 Implemented
MI0094 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,623 $4,110 Implemented
MI0093 # 07 Y:2004 07 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,755 $510 Implemented
MI0093 # 08 Y:2004 08 2004 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $23,333 $21,000 Implemented
WV0289 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,600 $4,857 Implemented
WV0289 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $9,956 $2,109 Implemented
WV0289 # 05 Y:2004 05 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,230 $1,687 Implemented
WV0289 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,340 $127 Implemented
WV0289 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,993 $250 Implemented
WV0289 # 12 Y:2004 12 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,170 $103 Implemented
WV0289 # 14 Y:2004 14 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,227 $1,631 Implemented
WV0289 # 15 Y:2004 15 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,365 $0 Implemented
MI0075 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,540 $1,300 Implemented
MI0075 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,940 $0 Implemented
MI0075 # 04 Y:2004 04 2004 CLEAR AND RENT EXISTING SPACE $124,576 $9,800 Implemented
MI0075 # 05 Y:2004 05 2004 CLEAR AND RENT EXISTING SPACE $42,330 $1,600 Implemented
AM0447 # 02 Y:2003 02 2003 AIR CONDITION ONLY SPACE NECESSARY $9,640 $190 Implemented
AM0447 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $200 Implemented
AM0447 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $830 Implemented
AM0447 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,655 $560 Implemented
LM0055 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,172 $120 Implemented
LM0055 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,209 $27,572 Implemented
LM0055 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $1,300 Implemented
LM0055 # 07 Y:2003 07 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $215,000 $20,000 Implemented