Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
440
matching recommendationsSIC | 3643 | Current-carrying Wiring Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0637 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $572 | $1,465 | Not Implemented |
WV0637 # 06 Y:2023 | 06 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $502 | $617 | Implemented |
WV0637 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,145 | $8,026 | Not Implemented |
WV0637 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $122 | $600 | Implemented |
MU0007 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,004 | $0 | Implemented |
MU0007 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,914 | $0 | Implemented |
MU0007 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,200 | $7,825 | Not Implemented |
MU0007 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $612 | $541 | Not Implemented |
MU0007 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,417 | $10,160 | Implemented |
MU0007 # 06 Y:2022 | 06 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $12 | $44 | Implemented |
MA0824 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,379 | $54,695 | Not Implemented |
MA0824 # 05 Y:2020 | 05 | 2020 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,491 | $6,300 | Implemented |
MA0824 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,177 | $29,750 | Implemented |
MA0824 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,118 | $7,710 | Implemented |
MA0824 # 01 Y:2020 | 01 | 2020 | REPLACE BOILER | $15,999 | $29,000 | Not Implemented |
OK1029 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,512 | $0 | Not Implemented |
OK1029 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,684 | $22,100 | Implemented |
OK1029 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,568 | $2,250 | Implemented |
OK1029 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,197 | $30,672 | Implemented |
OK1029 # 05 Y:2020 | 05 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $546 | $522 | Not Implemented |
LE0483 # 01 Y:2019 | 01 | 2019 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $200 | $40 | Implemented |
LE0483 # 02 Y:2019 | 02 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,044 | $11,000 | Not Implemented |
LE0483 # 03 Y:2019 | 03 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,352 | $12,000 | Not Implemented |
LE0483 # 05 Y:2019 | 05 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,574 | $20,000 | Implemented |
LE0483 # 04 Y:2019 | 04 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,605 | $12,900 | Not Implemented |