Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
166
matching recommendationsSIC | 3645 | Residential Lighting Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0661 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $673,610 | $245,000 | Implemented |
GT0660 # 01 Y:1999 | 01 | 1999 | COMBINE UTILITY METERS | $2,900 | $0 | Not Implemented |
GT0660 # 02 Y:1999 | 02 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,800 | $10,000 | Not Implemented |
GT0660 # 03 Y:1999 | 03 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $18,000 | $500 | Not Implemented |
GT0660 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,000 | $1,280 | Not Implemented |
GT0660 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,150 | $1,000 | Implemented |
GT0660 # 06 Y:1999 | 06 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,900 | $0 | Implemented |
GT0660 # 07 Y:1999 | 07 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $416 | $1,000 | Not Implemented |
GT0660 # 08 Y:1999 | 08 | 1999 | MAINTAIN/ENLARGE A STOCK OF SPARE PARTS | $161,575 | $300,000 | Implemented |
WI0290 # 01 Y:1997 | 01 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $119,620 | $15,000 | Implemented |
WI0290 # 02 Y:1997 | 02 | 1997 | REDUCE VENTILATION AIR | $10,493 | $15,000 | Not Implemented |
WI0290 # 03 Y:1997 | 03 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,560 | $5,000 | Implemented |
WI0290 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,200 | $15,000 | Not Implemented |
WI0290 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,755 | $330 | Implemented |
WI0290 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,526 | $1,380 | Not Implemented |
WI0290 # 07 Y:1997 | 07 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,982 | $0 | Not Implemented |
WI0290 # 08 Y:1997 | 08 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,333 | $500 | Implemented |
WI0290 # 09 Y:1997 | 09 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,280 | $1,120 | Implemented |
WI0290 # 10 Y:1997 | 10 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $784 | $0 | Not Implemented |
MS0065 # 01 Y:1996 | 01 | 1996 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $269 | $0 | Not Implemented |
MS0065 # 02 Y:1996 | 02 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $699 | $441 | Not Implemented |
MS0065 # 03 Y:1996 | 03 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,380 | $4,484 | Not Implemented |
MS0065 # 04 Y:1996 | 04 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,297 | $2,580 | Not Implemented |
MS0065 # 05 Y:1996 | 05 | 1996 | USE RE-USABLE FILTERS | $270 | $450 | Not Implemented |
MS0065 # 06 Y:1996 | 06 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $7,000 | $20,494 | Not Implemented |