IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3647 Vehicular Lighting Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,714 $15,000 Not Implemented
TT0244 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $16,484 $39,000 Not Implemented
TT0244 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $200 Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
TT0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,307 $190,198 Implemented
BS0134 # 02 Y:2020 02 2020 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,687 $7,120 Not Implemented
BS0134 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $12,790 Not Implemented
BS0134 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,704 $1,017 Not Implemented
BS0134 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $1,507 $3,280 Not Implemented
BS0134 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $405 Not Implemented
BS0134 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $760 $1,471 Not Implemented
IP0109 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,301 $51,647 Implemented
IP0109 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,423 $0 Implemented
IP0109 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $59 Implemented
IP0109 # 07 Y:2018 07 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,448 $205,000 Not Implemented
IP0109 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,342 $5,885 Implemented
IP0109 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,506 $1,246 Not Implemented
IP0109 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,901 $2,251 Not Implemented
UA0147 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,366 $72,811 Not Implemented
UA0147 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,593 $1,875 Not Implemented
UA0147 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $46 $117 Implemented
UA0147 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,930 Implemented
UA0147 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,680 $1,096 Not Implemented