Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 3647 | Vehicular Lighting Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0244 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,937 | $40 | Not Implemented |
TT0244 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,956 | $275 | Not Implemented |
TT0244 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,714 | $15,000 | Not Implemented |
TT0244 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $16,484 | $39,000 | Not Implemented |
TT0244 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $200 | Implemented |
TT0244 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $131 | $167 | Not Implemented |
TT0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $97,307 | $190,198 | Implemented |
BS0134 # 02 Y:2020 | 02 | 2020 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,687 | $7,120 | Not Implemented |
BS0134 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,955 | $12,790 | Not Implemented |
BS0134 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,704 | $1,017 | Not Implemented |
BS0134 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,507 | $3,280 | Not Implemented |
BS0134 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $405 | Not Implemented |
BS0134 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $760 | $1,471 | Not Implemented |
IP0109 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,301 | $51,647 | Implemented |
IP0109 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,423 | $0 | Implemented |
IP0109 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $59 | Implemented |
IP0109 # 07 Y:2018 | 07 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $44,448 | $205,000 | Not Implemented |
IP0109 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,342 | $5,885 | Implemented |
IP0109 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,506 | $1,246 | Not Implemented |
IP0109 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,901 | $2,251 | Not Implemented |
UA0147 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,366 | $72,811 | Not Implemented |
UA0147 # 04 Y:2015 | 04 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,593 | $1,875 | Not Implemented |
UA0147 # 03 Y:2015 | 03 | 2015 | USE PHOTOCELL CONTROLS | $46 | $117 | Implemented |
UA0147 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $1,930 | Implemented |
UA0147 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,680 | $1,096 | Not Implemented |