IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3648 Lighting Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0423 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,841 $2,700 Implemented
MA0423 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,806 $300 Implemented
AM0271 # 04 Y:1996 04 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,860 $0 Implemented
AM0271 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $6,248 $11,200 Implemented
AM0271 # 07 Y:1996 07 1996 CONVERT TO ELECTROSTATIC POWDER COATING $52,440 $160,000 Implemented
AM0271 # 02 Y:1996 02 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,147 $0 Implemented
AM0271 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $210 Implemented
WI0214 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,933 $600 Implemented
WI0214 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $2,036 Implemented
WI0214 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,682 $500 Implemented
WI0214 # 09 Y:1994 09 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,642 $640 Implemented
WI0214 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,450 $350 Implemented
WV0022 # 05 Y:1994 05 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,596 $1,125 Implemented
WV0022 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,183 $5,000 Implemented
WV0022 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $294 $9,520 Implemented
ME0104 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,446 $200 Implemented
ME0104 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,735 $50 Implemented
ME0104 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,808 $0 Implemented
ME0104 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,217 $500 Implemented
ME0104 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $200 Implemented
KU0354 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $7,348 $1,000 Implemented
KU0354 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $570 $330 Implemented
KU0354 # 04 Y:1991 04 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $825 $200 Implemented
KU0354 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $100 Implemented
KU0354 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $988 $705 Implemented