Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsSIC | 3651 | Household Audio And Video Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0605 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $24,945 | $4,958 | Implemented |
SF0605 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $129,996 | $428,510 | Not Implemented |
SF0605 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $233 | $1,287 | Implemented |
SF0605 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $2,116 | $10,832 | Implemented |
SF0605 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $848 | $420 | Not Implemented |
SF0605 # 06 Y:2023 | 06 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $21,756 | $37,440 | Not Implemented |
SF0605 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,696 | $38,888 | Not Implemented |
MI0366 # 04 Y:2020 | 04 | 2020 | USE PHOTOCELL CONTROLS | $3,435 | $4,831 | Not Implemented |
MI0366 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,463 | $1,980 | Not Implemented |
MI0366 # 05 Y:2020 | 05 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,258 | $2,265 | Not Implemented |
MI0366 # 02 Y:2020 | 02 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,035 | $1,115 | Not Implemented |
MI0366 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,152 | $120 | Not Implemented |
MI0366 # 07 Y:2020 | 07 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,903 | $4,341 | Not Implemented |
MI0366 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,690 | $1,188 | Not Implemented |
MI0366 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,590 | $93,076 | Not Implemented |
SF0484 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,008 | $60,348 | Implemented |
SF0484 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $7,061 | $29,179 | Implemented |
SF0484 # 02 Y:2016 | 02 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,860 | $954 | Not Implemented |
SF0484 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $344 | $1,296 | Not Implemented |
SF0484 # 01 Y:2016 | 01 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,292 | $0 | Implemented |
UD0947 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,920 | $1,000 | Implemented |
UD0947 # 17 Y:2016 | 17 | 2016 | DISCONNECT BALLASTS | $694 | $345 | Not Implemented |
UD0947 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $1,000 | Not Implemented |
UD0947 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $618 | $200 | Not Implemented |
UD0947 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $953 | $2,000 | Not Implemented |