IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3652 Prerecorded Records And Tapes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0564 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $973 $400 Not Implemented
SD0564 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $1,676 $2,046 Not Implemented
SD0564 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,302 $2,468 Not Implemented
SD0564 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $27,785 Not Implemented
SD0564 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $17,517 $86,400 Implemented
GT0783 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $5,000 $1,500 Implemented
GT0783 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,875 $655 Implemented
GT0783 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,242 $20,982 Implemented
GT0783 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,190 $1,020 Implemented
GT0783 # 05 Y:2004 05 2004 METER WASTE WATER $33,200 $2,000 Implemented
GT0783 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $35,410 $0 Implemented
GT0783 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,670 $3,000 Not Implemented
GT0783 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $1,250 Implemented
GT0783 # 03 Y:2004 03 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,110 $3,700 Not Implemented
MI0020 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,304 $256 Not Implemented
MI0020 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,932 $256 Not Implemented
MI0020 # 05 Y:2001 05 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,743 $16 Not Implemented
MI0020 # 04 Y:2001 04 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,965 $16 Not Implemented
MI0020 # 03 Y:2001 03 2001 $14,899 $139 Not Implemented
MI0020 # 02 Y:2001 02 2001 REDESIGN PROCESS $24,074 $13,312 Not Implemented
MI0020 # 01 Y:2001 01 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $279,552 $120 Not Implemented
TP0014 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $1,948 Implemented
TP0014 # 01 Y:2000 01 2000 RECOVER AND REUSE WASTE MATERIAL $12,967 $0 Not Implemented
TP0014 # 02 Y:2000 02 2000 $3,047 $96 Not Implemented
TP0014 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,048 $3,875 Not Implemented