Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
462
matching recommendationsSIC | 366 | Communications Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0323 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $222 | $570 | Not Implemented |
SU0323 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $430 | $1,454 | Not Implemented |
SU0323 # 08 Y:2012 | 08 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $103 | $440 | Not Implemented |
SU0323 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,340 | $37,030 | Not Implemented |
UA0070 # 01 Y:2011 | 01 | 2011 | DISCONNECT BALLASTS | $47,591 | $5,500 | Not Implemented |
UA0070 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $549 | $845 | Not Implemented |
UA0070 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,386 | $2,900 | Not Implemented |
UA0070 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,557 | $80 | Not Implemented |
UA0070 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,086 | $15,744 | Not Implemented |
MI0203 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $16,812 | $34,688 | Implemented |
MI0203 # 02 Y:2011 | 02 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,265 | $2,500 | Implemented |
MI0203 # 03 Y:2011 | 03 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $8,406 | $12,400 | Not Implemented |
MI0203 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,489 | $5,225 | Implemented |
MI0203 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,157 | $50 | Implemented |
MI0203 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,006 | $1,320 | Implemented |
AS0396 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,749 | $1,000 | Not Implemented |
AS0396 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $5,000 | Not Implemented |
AS0396 # 03 Y:2005 | 03 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $107 | $50 | Not Implemented |
AS0396 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $474 | $150 | Not Implemented |
AS0396 # 05 Y:2005 | 05 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $912 | $1,000 | Not Implemented |
AS0396 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,302 | $1,000 | Not Implemented |
AS0396 # 07 Y:2005 | 07 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $8,063 | $3,000 | Not Implemented |
AM0483 # 01 Y:2005 | 01 | 2005 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $29,900 | $0 | Implemented |
AM0483 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,715 | $820 | Not Implemented |
AM0483 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $7,880 | $27,800 | Not Implemented |