IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
SIC 3669 Communications Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8387 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,856 $0 n/a
LT8387 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,050 $0 n/a
LT8387 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $2,819 $0 n/a
AM0890 # 09 Y:2023 09 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $89 $38 n/a
AM0890 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $240 $480 n/a
AM0890 # 07 Y:2023 07 2023 USE SYNTHETIC LUBRICANT $350 $200 n/a
AM0890 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $18 n/a
AM0890 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,310 $0 n/a
AM0890 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,090 $1,000 n/a
AM0890 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,660 $2,690 n/a
AM0890 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $12,180 $0 n/a
AM0890 # 04 Y:2023 04 2023 PAY UTILITY BILLS ON TIME $2,933 $0 n/a
AM0645 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,290 $750 Implemented
AM0645 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $570 $60 Implemented
AM0645 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,070 $0 Not Implemented
AM0645 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,885 $63,000 Implemented
AM0645 # 05 Y:2013 05 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $480 $1,000 Not Implemented
UA0070 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $549 $845 Not Implemented
UA0070 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,386 $2,900 Not Implemented
UA0070 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,557 $80 Not Implemented
UA0070 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,086 $15,744 Not Implemented
UA0070 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $47,591 $5,500 Not Implemented
IA0259 # 09 Y:2000 09 2000 $132,600 $250,000 Not Implemented
IA0259 # 06 Y:2000 06 2000 RECOVER AND REUSE SPENT ACID BATHS $58,747 $2,500 Not Implemented
IA0259 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $120 $40 Not Implemented