IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0434 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,530 $960 Implemented
MI0434 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,323 $7,394 Implemented
MI0434 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,225 $2,000 Implemented
MI0434 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $14,048 $0 Implemented
MI0434 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,836 $550 Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0361 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,612 $160 Implemented
MI0361 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,647 $100,030 Implemented
MI0361 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0361 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $17,548 $3,600 Implemented
MI0361 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,278 $17,214 Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MI0294 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,734 $29,594 Implemented