IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0831 # 04 Y:2022 04 2022 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $42,140 $270,000 Not Implemented
MA0831 # 08 Y:2022 08 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,654 $15,630 Not Implemented
MA0831 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,697 $25,920 Not Implemented
MA0831 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,489 $9,040 Implemented
MA0831 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,657 $42,058 Implemented
MA0831 # 05 Y:2022 05 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,831 $1,000 Implemented
MA0831 # 09 Y:2022 09 2022 INSULATE FEEDWATER TANK $798 $1,376 Implemented
MA0831 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $247,461 $2,531,558 Not Implemented
MA0831 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,808 $21,525 Not Implemented
MA0756 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $576 $1,392 Not Implemented
MA0756 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $1,278 $1,000 Not Implemented
MA0756 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $6,277 $2,320 Not Implemented
MA0756 # 05 Y:2016 05 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,508 $10,800 Not Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0666 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $550 $200 Not Implemented
MA0666 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,146 $5,990 Not Implemented
MA0666 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,085 $8,685 Not Implemented
MA0640 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $11,811 $11,850 Implemented
MA0640 # 03 Y:2008 03 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,640 $43,000 Not Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
MA0640 # 04 Y:2008 04 2008 MINIMIZE WATER USAGE $4,210 $18,000 Not Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented