IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0179 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $500 Implemented
KU0179 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,693 $764 Not Implemented
KU0179 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,450 Implemented
KU0179 # 04 Y:1985 04 1985 USE OPTIMUM THICKNESS INSULATION $730 $1,138 Not Implemented
KU0179 # 05 Y:1985 05 1985 COVER OPEN TANKS $279 $60 Implemented
KU0179 # 06 Y:1985 06 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
CO0033 # 01 Y:1985 01 1985 REDUCE VENTILATION AIR $27,000 $399 Implemented
CO0033 # 02 Y:1985 02 1985 REDUCE VENTILATION AIR $7,279 $824 Implemented
CO0033 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,343 $4,000 Implemented
CO0033 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,584 $3,500 Not Implemented
CO0033 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $655 $3,000 Implemented
CO0033 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $200 Implemented
CO0033 # 07 Y:1985 07 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $134 $162 Implemented
CO0033 # 08 Y:1985 08 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,006 $3,619 Implemented
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented
CO0035 # 05 Y:1985 05 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,596 $24 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
KU0160 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,445 $10,000 Implemented
KU0160 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,982 $900 Implemented
KU0160 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,662 $2,000 Implemented
KU0160 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $371 $192 Not Implemented