IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

473

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0637 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,393 $700 Implemented
SD0637 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $283 $250 Implemented
SD0637 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,827 $115,927 Not Implemented
SD0637 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $788 $1,660 Not Implemented
SD0637 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $53,597 $0 Not Implemented
SD0637 # 09 Y:2023 09 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,900 $2,000 Not Implemented
SD0637 # 10 Y:2023 10 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,625 $49,475 Not Implemented
CI0007 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,887 $50 Not Implemented
CI0007 # 04 Y:2023 04 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,248 $4,500 Not Implemented
CI0007 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,123 $836 Not Implemented
CI0007 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $853 $0 Not Implemented
CI0007 # 08 Y:2023 08 2023 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $663 $0 Not Implemented
CI0007 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $4,072 $15,610 Not Implemented
CI0007 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $52,065 $0 Not Implemented
CI0007 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,880 $300 Not Implemented
SF0585 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $3,867 $8,345 Implemented
SF0585 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,174 $2,893 Implemented
SF0585 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $897 $400 Implemented
SF0585 # 07 Y:2022 07 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,102 $105,401 Not Implemented
SF0585 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $95,415 $561,099 Not Implemented
SF0585 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,840 $8,000 Not Implemented
SF0585 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,341 $0 Implemented
SF0574 # 05 Y:2021 05 2021 REDUCE DELIVERY SCHEDULES $19,915 $56,589 Implemented
SF0574 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $4,064 Not Implemented
SF0574 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $5,306 Implemented