Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0942 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $469,328 | $2,302,430 | Not Implemented |
OK0942 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $600 | $3,450 | Implemented |
OK0892 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $635 | $689 | Not Implemented |
OK0892 # 11 Y:2014 | 11 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,802 | $10,000 | Not Implemented |
OK0892 # 13 Y:2014 | 13 | 2014 | INSULATE BARE EQUIPMENT | $2,848 | $899 | Not Implemented |
OK0892 # 12 Y:2014 | 12 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,648 | $10,200 | Not Implemented |
OK0892 # 10 Y:2014 | 10 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $167 | $660 | Implemented |
OK0892 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,294 | $3,969 | Not Implemented |
OK0892 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,809 | $7,935 | Not Implemented |
OK0892 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,538 | $1,619 | Not Implemented |
OK0892 # 09 Y:2014 | 09 | 2014 | REPLACE BOILER | $3,189 | $14,400 | Not Implemented |
OK0892 # 06 Y:2014 | 06 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,109 | $2,560 | Not Implemented |
OK0892 # 08 Y:2014 | 08 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $148 | $160 | Implemented |
OK0892 # 07 Y:2014 | 07 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $105 | $28 | Implemented |
OK0892 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,055 | $560 | Implemented |
AM0623 # 03 Y:2012 | 03 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $36,640 | $10,000 | Not Implemented |
AM0623 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,838 | $500 | Not Implemented |
AM0623 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,538 | $1,045 | Not Implemented |
AM0623 # 06 Y:2012 | 06 | 2012 | OPTIMIZE PLANT POWER FACTOR | $4,500 | $8,160 | Not Implemented |
AM0623 # 07 Y:2012 | 07 | 2012 | TREAT AND REUSE RINSE WATERS | $3,300 | $3,000 | Not Implemented |
AM0623 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $3,100 | $570 | Not Implemented |
AM0623 # 09 Y:2012 | 09 | 2012 | USE SYNTHETIC LUBRICANT | $1,010 | $0 | Not Implemented |
AM0623 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,800 | $13,240 | Not Implemented |
AM0623 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $75,600 | $270,000 | Not Implemented |
AM0621 # 04 Y:2012 | 04 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $220 | $0 | Not Implemented |