Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS028 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,762 | $5,000 | Implemented |
MAS025 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $50,701 | $22,000 | Not Implemented |
MAS025 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $11,105 | $10,770 | Not Implemented |
MAS025 # 03 Y:2012 | 03 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,097 | $0 | Not Implemented |
MAS025 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $5,622 | $935 | Not Implemented |
MAS025 # 05 Y:2012 | 05 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,171 | $4,300 | Implemented |
MI0221 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,726 | $1,800 | Implemented |
MI0221 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,561 | $1,660 | Implemented |
MI0221 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,281 | $11,600 | Implemented |
MI0221 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,238 | $80 | Implemented |
MI0221 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,133 | $5,826 | Not Implemented |
MI0221 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $1,075 | Implemented |
MI0221 # 07 Y:2012 | 07 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,296 | $2,784 | Not Implemented |
MI0221 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,022 | $80 | Not Implemented |
MI0221 # 09 Y:2012 | 09 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $712 | $1,208 | Not Implemented |
MI0221 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $685 | $541 | Not Implemented |
MI0221 # 11 Y:2012 | 11 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $929 | $2,335 | Not Implemented |
BD0413 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,209 | $12,000 | Not Implemented |
BD0413 # 02 Y:2012 | 02 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,063 | $3,690 | Not Implemented |
BD0413 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,599 | $3,696 | Implemented |
BD0413 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,421 | $300 | Not Implemented |
BD0413 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,935 | $2,100 | Implemented |
BD0413 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,398 | $20 | Not Implemented |
BD0413 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $753 | $500 | Implemented |
BD0413 # 08 Y:2012 | 08 | 2012 | USE POWER DURING OFF-PEAK PERIODS | $555 | $20 | Not Implemented |