IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

473

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0544 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $3,481 $10,611 Implemented
SD0544 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,765 $3,500 Implemented
SD0544 # 05 Y:2017 05 2017 ISOLATE HOT OR COLD EQUIPMENT $5,008 $2,160 Not Implemented
SD0544 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,488 $8,800 Implemented
SD0544 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,835 $26,705 Implemented
SD0544 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,529 $41,589 Implemented
SD0544 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,627 $14,788 Not Implemented
SD0514 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $188,380 $121,434 Implemented
SD0514 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,024 $1,200 Implemented
SD0514 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,935 $2,000 Implemented
SD0514 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,376 $3,380 Implemented
SD0514 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,336 $400 Not Implemented
SD0492 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $153,319 $210,684 Not Implemented
SD0492 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,158 $34,531 Implemented
SD0492 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $3,880 $1,527 Implemented
SD0492 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,731 $4,350 Implemented
SD0492 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $881 $1,791 Implemented
SD0492 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $400 Implemented
SF0397 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,066 $2,420 Implemented
SF0397 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $6,639 Not Implemented
SF0397 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,428 $6,271 Implemented
SF0397 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,294 $7,163 Implemented
SF0397 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,656 $79,881 Implemented
SF0397 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,839 $152,713 Not Implemented
SF0397 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,301 $9,456 Not Implemented