IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0433 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,142 $7,500 n/a
AS0433 # 04 Y:2006 04 2006 INSTALL EFFICIENT RECTIFIERS $540 $15,000 n/a
AS0432 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,236 $15,000 n/a
AS0432 # 02 Y:2006 02 2006 USE SOLAR HEAT TO HEAT WATER $13,683 $78,400 n/a
AS0432 # 03 Y:2006 03 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $9,888 $3,000 n/a
AS0432 # 04 Y:2006 04 2006 INSTALL EFFICIENT RECTIFIERS $540 $15,000 n/a
CO0591 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $200 Implemented
CO0591 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $610 $0 Implemented
CO0591 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $260 $30 Not Implemented
CO0591 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $5,290 Not Implemented
CO0591 # 05 Y:2006 05 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,900 $32,600 Not Implemented
CO0591 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,350 $1,290 Not Implemented
CO0591 # 07 Y:2006 07 2006 DISCONNECT BALLASTS $310 $110 Implemented
LE0240 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $265,405 $500,000 Implemented
LE0240 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $74,790 $800 Not Implemented
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
LE0240 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,770 $139,872 Not Implemented
OK0733 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,333 $5,000 Not Implemented
OK0733 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $6,122 $13,600 Implemented
OK0733 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,003 $980 Implemented