Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0695 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,434 | $0 | Not Implemented |
UD0695 # 08 Y:2004 | 08 | 2004 | USE MINIMUM SAFE OVEN VENTILATION | $2,564 | $0 | Implemented |
UD0695 # 09 Y:2004 | 09 | 2004 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,331 | $175 | Implemented |
UD0695 # 10 Y:2004 | 10 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,110 | $0 | Implemented |
UD0695 # 11 Y:2004 | 11 | 2004 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $784 | $0 | Implemented |
UD0695 # 12 Y:2004 | 12 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $729 | $0 | Implemented |
UD0695 # 13 Y:2004 | 13 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $397 | $756 | Implemented |
UD0695 # 14 Y:2004 | 14 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $420 | $340 | Not Implemented |
UD0695 # 15 Y:2004 | 15 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $339 | $0 | Implemented |
UD0695 # 16 Y:2004 | 16 | 2004 | DISCONNECT BALLASTS | $327 | $7 | Implemented |
UD0695 # 17 Y:2004 | 17 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $237 | $213 | Implemented |
SD0340 # 01 Y:2004 | 01 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,521 | $3,790 | Not Implemented |
SD0340 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,560 | $570 | Implemented |
SD0340 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,177 | $0 | Not Implemented |
SD0340 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $393 | $0 | Implemented |
SD0340 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,663 | $23,543 | Implemented |
SD0340 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $989 | $400 | Not Implemented |
AS0371 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $87,632 | $105,000 | Not Implemented |
AS0371 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,038 | $22,800 | Not Implemented |
AS0371 # 03 Y:2004 | 03 | 2004 | SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL | $17,943 | $12,000 | Not Implemented |
AS0371 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,453 | $7,000 | Not Implemented |
AS0371 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,040 | $45,048 | Not Implemented |
AS0371 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,176 | $60 | Not Implemented |
AS0371 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,938 | $144 | Not Implemented |
AS0371 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $2,853 | $4,125 | Not Implemented |