IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0541 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $89,343 $700,000 n/a
MA0541 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,861 $46,350 Not Implemented
MA0541 # 03 Y:2003 03 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,763 $14,000 Not Implemented
MA0541 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,264 $5,500 Implemented
MA0541 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,600 $22,000 n/a
MA0541 # 06 Y:2003 06 2003 USE MINIMUM STEAM OPERATING PRESSURE $5,023 $5,000 Implemented
MA0541 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,751 $0 Not Implemented
MA0541 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $635 $260 Implemented
MA0541 # 09 Y:2003 09 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $523 $72 Not Implemented
UF0333 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,176 $13 n/a
UF0333 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,653 $16,060 n/a
UF0333 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $4,492 $4,010 n/a
UF0333 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,886 $626 n/a
UF0333 # 05 Y:2003 05 2003 METER WASTE WATER $1,545 $1,700 n/a
UF0333 # 06 Y:2003 06 2003 INSTALL BACK-UP EQUIPMENT $22,100 $120,000 n/a
UD0681 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $82,000 $1,490 Implemented
UD0681 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $26,822 $100,000 Not Implemented
UD0681 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,200 $8,060 Not Implemented
UD0681 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $7,947 Implemented
UD0681 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,840 $700 Not Implemented
UD0681 # 06 Y:2003 06 2003 REDUCE VENTILATION AIR $2,785 $1,360 Not Implemented
UD0681 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $1,800 $0 Implemented
UD0681 # 08 Y:2003 08 2003 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,740 $0 Implemented
UD0681 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,095 $1,268 Not Implemented
UD0681 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,095 $91 Not Implemented