IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0428 # 04 Y:1998 04 1998 IMPROVE SPACE COMFORT CONDITIONING $5,656 $11,874 Not Implemented
MA0428 # 05 Y:1998 05 1998 ADOPT IN-HOUSE MATERIAL GENERATION $5,618 $29,750 Not Implemented
OR0335 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $347,930 $644,800 Not Implemented
OR0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,045 $1,000 Implemented
OR0335 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $0 Not Implemented
OR0335 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $310 $0 Implemented
OR0330 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $335,710 $438,500 Not Implemented
OR0330 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
OR0330 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Not Implemented
OR0330 # 04 Y:1998 04 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $163,740 $125,000 Not Implemented
OR0330 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $10,538 $14,800 Not Implemented
SF0149 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $690 $15 Implemented
SF0149 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $368 $0 Implemented
SF0149 # 03 Y:1998 03 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $555 $495 Not Implemented
SF0149 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $844 $2,640 Not Implemented
SF0149 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,333 $5,522 Not Implemented
SF0149 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,627 $25,680 Implemented
SF0149 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $780 $145 Not Implemented
SF0149 # 08 Y:1998 08 1998 INSTALL SENSORS TO DETECT DEFECTS $80,000 $40,000 Implemented
SF0149 # 09 Y:1998 09 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $117,000 $400,000 Implemented
CO0424 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,580 $1,000 Not Implemented
CO0424 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,030 $450 Not Implemented
AS0228 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $244,239 $410,200 Implemented
AS0228 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $955,252 $4,000,000 Not Implemented
AS0228 # 03 Y:1998 03 1998 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $395,073 $1,524,052 Not Implemented