IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0189 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $425 $800 Not Implemented
UF0189 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,074 $74,230 Not Implemented
UF0189 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $904 $700 Implemented
UF0189 # 06 Y:1997 06 1997 RECOVER AND REUSE WASTE MATERIAL $3,500 $1,000 Implemented
UF0189 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $25,456 $0 Not Implemented
UF0189 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,950 $750 Implemented
UF0189 # 09 Y:1997 09 1997 MODIFY CURRENT INCENTIVE PROGRAM $600,000 $15,000 Implemented
UF0189 # 10 Y:1997 10 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $850,769 $87,000 Implemented
AS0213 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $286 $450 Not Implemented
AS0213 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $287 $300 Not Implemented
AS0213 # 03 Y:1997 03 1997 DISCONNECT BALLASTS $277 $15 Not Implemented
AS0213 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $348 Not Implemented
AS0213 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,357 $3,800 Not Implemented
AS0213 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,642 $1,827 Not Implemented
AS0213 # 07 Y:1997 07 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $1,813 $5,185 Not Implemented
AS0213 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,674 $60 Not Implemented
AS0213 # 09 Y:1997 09 1997 ADOPT IN-HOUSE MATERIAL GENERATION $1,487 $1,020 Not Implemented
AS0213 # 10 Y:1997 10 1997 INSTALL AN UNINTERUPTABLE POWER SUPPLY $1,365,942 $500,000 Not Implemented
MA0402 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217,449 $140,000 Not Implemented
MA0402 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,092 $16,597 Not Implemented
MA0402 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,628 $6,075 Not Implemented
MA0402 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,721 $4,925 Not Implemented
MA0402 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,577 $4,275 Not Implemented
MA0402 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $200 Not Implemented
SD0184 # 01 Y:1997 01 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,327 $150 Implemented