IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0508 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $9,650 $5,000 Not Implemented
UD0508 # 06 Y:1996 06 1996 ELIMINATE/REDUCE AN OPERATION $8,523 $0 Implemented
UD0508 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $101,584 $40,000 Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
UD0508 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $2,286 Implemented
UD0508 # 10 Y:1996 10 1996 RECOVER AND REUSE COOLING WATER $5,108 $5,000 Implemented
WI0285 # 01 Y:1996 01 1996 REDUCE VENTILATION AIR $210,013 $64,100 Not Implemented
WI0285 # 02 Y:1996 02 1996 INCREASE USE OF AUTOMATION $60,000 $140,000 Not Implemented
WI0285 # 03 Y:1996 03 1996 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,786 $0 Implemented
WI0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,042 $3,100 Not Implemented
WI0285 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,605 $8,500 Not Implemented
WI0285 # 06 Y:1996 06 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,549 $10,500 Not Implemented
WI0285 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,680 $1,216 Not Implemented
WI0285 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,347 $2,521 Not Implemented
WI0285 # 09 Y:1996 09 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100 $0 Not Implemented
WI0285 # 10 Y:1996 10 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $380 $500 Not Implemented
MA0369 # 01 Y:1996 01 1996 ADOPT IN-HOUSE MATERIAL GENERATION $21,886 $11,000 Implemented
MA0369 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,735 $49,531 Not Implemented
MA0369 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,903 $8,750 Not Implemented
MA0369 # 04 Y:1996 04 1996 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,500 $850 Not Implemented
MA0369 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,541 $3,401 Not Implemented
MA0369 # 06 Y:1996 06 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $919 $0 Implemented
KU0462 # 01 Y:1996 01 1996 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $28,125 $359 Implemented
KU0462 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,852 $312 Implemented
KU0462 # 03 Y:1996 03 1996 TREAT AND REUSE RINSE WATERS $6,559 $3,041 Implemented