Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0831 # 04 Y:2022 | 04 | 2022 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $42,140 | $270,000 | Not Implemented |
MA0831 # 08 Y:2022 | 08 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,654 | $15,630 | Not Implemented |
MA0831 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,697 | $25,920 | Not Implemented |
MA0831 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,489 | $9,040 | Implemented |
MA0831 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,657 | $42,058 | Implemented |
MA0831 # 05 Y:2022 | 05 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,831 | $1,000 | Implemented |
MA0831 # 09 Y:2022 | 09 | 2022 | INSULATE FEEDWATER TANK | $798 | $1,376 | Implemented |
MA0831 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $247,461 | $2,531,558 | Not Implemented |
MA0831 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,808 | $21,525 | Not Implemented |
MA0756 # 06 Y:2016 | 06 | 2016 | OPTIMIZE PLANT POWER FACTOR | $576 | $1,392 | Not Implemented |
MA0756 # 04 Y:2016 | 04 | 2016 | REDUCE VENTILATION AIR | $1,278 | $1,000 | Not Implemented |
MA0756 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $6,277 | $2,320 | Not Implemented |
MA0756 # 05 Y:2016 | 05 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,508 | $10,800 | Not Implemented |
MA0756 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,797 | $7,000 | Implemented |
MA0756 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,102 | $6,500 | Implemented |
MA0666 # 03 Y:2010 | 03 | 2010 | ADD AREA LIGHTING SWITCHES | $1,900 | $500 | Implemented |
MA0666 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $550 | $200 | Not Implemented |
MA0666 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,146 | $5,990 | Not Implemented |
MA0666 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,085 | $8,685 | Not Implemented |
MA0640 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,811 | $11,850 | Implemented |
MA0640 # 03 Y:2008 | 03 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,640 | $43,000 | Not Implemented |
MA0640 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $689 | Implemented |
MA0640 # 04 Y:2008 | 04 | 2008 | MINIMIZE WATER USAGE | $4,210 | $18,000 | Not Implemented |
MA0640 # 05 Y:2008 | 05 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | Implemented |
MA0640 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |