Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2411 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $819 | $3,620 | n/a |
UC2411 # 06 Y:2024 | 06 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,203 | $1,779 | n/a |
UC2411 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $572 | $2,608 | n/a |
UC2411 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,065 | $75 | n/a |
UC2411 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,268 | $223,076 | n/a |
UC2411 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $78 | $100 | n/a |
UC2411 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $962 | $0 | n/a |
ME0224 # 05 Y:1997 | 05 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,067 | $279 | Implemented |
ME0224 # 09 Y:1997 | 09 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $214 | $1,850 | Implemented |
ME0224 # 08 Y:1997 | 08 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,760 | $0 | Implemented |
ME0224 # 07 Y:1997 | 07 | 1997 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $3,640 | $5,000 | Implemented |
ME0224 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $965 | $250 | Implemented |
ME0224 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,967 | $650 | Not Implemented |
ME0224 # 03 Y:1997 | 03 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,198 | $1,666 | Not Implemented |
ME0224 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,674 | $5,557 | Implemented |
ME0224 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $47,583 | $18,145 | Implemented |
MA0145 # 01 Y:1989 | 01 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,559 | $0 | Not Implemented |
MA0145 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $125 | $0 | Implemented |
MA0145 # 07 Y:1989 | 07 | 1989 | INSTALL SET-BACK TIMERS | $206 | $525 | Implemented |
MA0145 # 06 Y:1989 | 06 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $246 | $87 | Implemented |
MA0145 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $824 | $356 | Not Implemented |
MA0145 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,228 | $160 | Not Implemented |
MA0145 # 03 Y:1989 | 03 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,036 | $4,870 | Not Implemented |
MA0145 # 02 Y:1989 | 02 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,230 | $4,500 | Implemented |