Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0109 # 06 Y:2001 | 06 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $982 | $0 | Not Implemented |
SU0109 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,244 | $0 | Not Implemented |
SU0109 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $28 | $0 | Implemented |
SU0109 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,828 | $30 | Implemented |
SU0109 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $1,123 | $213 | Implemented |
SU0109 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $662 | Implemented |
NC0226 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,122 | $2,225 | Not Implemented |
NC0226 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $10,828 | $12,834 | Not Implemented |
NC0226 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,348 | $500 | Not Implemented |
NC0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,071 | $407 | Not Implemented |
NC0226 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,800 | $400 | Not Implemented |
NC0226 # 08 Y:2001 | 08 | 2001 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $93,403 | $-312,000 | Not Implemented |
NC0226 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $150 | Not Implemented |
NC0226 # 07 Y:2001 | 07 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,668 | $26,000 | Not Implemented |
BD0197 # 06 Y:2001 | 06 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $418 | $0 | Implemented |
BD0197 # 01 Y:2001 | 01 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $3,885 | $3,000 | Not Implemented |
BD0197 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,659 | $5,000 | Implemented |
BD0197 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,104 | $600 | Implemented |
BD0197 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $229 | $157 | Implemented |
BD0197 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $144 | $450 | Implemented |
LM0010 # 05 Y:2001 | 05 | 2001 | COMBINE UTILITY METERS | $100,007 | $60,200 | Not Implemented |
LM0010 # 07 Y:2001 | 07 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $312,000 | $100,000 | Not Implemented |
LM0010 # 02 Y:2001 | 02 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,603 | $5,085 | Implemented |
LM0010 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,507 | $0 | Implemented |
LM0010 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $21,880 | $11,800 | Not Implemented |