Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0254 # 07 Y:2007 | 07 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,029 | $800 | Not Implemented |
LE0254 # 06 Y:2007 | 06 | 2007 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $5,988 | $3,000 | Implemented |
LE0254 # 05 Y:2007 | 05 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,471 | $800 | Not Implemented |
LE0254 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,686 | $20,000 | Implemented |
LE0254 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,157 | $20,000 | Not Implemented |
LE0254 # 02 Y:2007 | 02 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $67,570 | $67,000 | Not Implemented |
LE0254 # 01 Y:2007 | 01 | 2007 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $81,900 | $65,000 | Not Implemented |
MS0314 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,129 | $10,729 | Implemented |
MS0314 # 02 Y:2007 | 02 | 2007 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $3,612 | $10,968 | Not Implemented |
MS0314 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,816 | $9,213 | Implemented |
MS0314 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,048 | $166 | Implemented |
MS0314 # 05 Y:2007 | 05 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $915 | $1,175 | Implemented |
MS0314 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $844 | $712 | Not Implemented |
MA0613 # 01 Y:2007 | 01 | 2007 | REDUCE VENTILATION AIR | $22,488 | $15,475 | Implemented |
MA0613 # 02 Y:2007 | 02 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,346 | $54,617 | Implemented |
MA0613 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,574 | $53,250 | Implemented |
MA0613 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $20,408 | $15,900 | Not Implemented |
MA0613 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $507 | $256 | Implemented |
SU0250 # 04 Y:2007 | 04 | 2007 | USE SYNTHETIC LUBRICANT | $82 | $0 | Implemented |
SU0250 # 01 Y:2007 | 01 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,666 | $0 | Not Implemented |
SU0250 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $696 | $0 | Implemented |
SU0250 # 06 Y:2007 | 06 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,593 | $191 | Not Implemented |
SU0250 # 14 Y:2007 | 14 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,281 | $6,030 | Not Implemented |
SU0250 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $243 | $0 | Implemented |
SU0250 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,654 | $425 | Implemented |