IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0167 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $184 $200 Not Implemented
WM0167 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $2,035 Not Implemented
WM0167 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,911 Not Implemented
WM0167 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,554 $0 Implemented
WM0167 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,266 $0 Not Implemented
WM0167 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,789 $0 Not Implemented
WM0167 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,549 $6,864 Not Implemented
SF0574 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,332 $38,413 Implemented
SF0574 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $4,064 Not Implemented
SF0574 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $5,306 Implemented
SF0574 # 05 Y:2021 05 2021 REDUCE DELIVERY SCHEDULES $19,915 $56,589 Implemented
SF0574 # 04 Y:2021 04 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $96,904 $419,477 Implemented
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented
NL0059 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $702 $4,153 Not Implemented
NL0059 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,198 $50,347 Not Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
NL0059 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,350 Not Implemented
NL0059 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $220 Not Implemented
OR0741 # 03 Y:2021 03 2021 USE HEAT PUMP FOR SPACE CONDITIONING $25,522 $19,860 Not Implemented
OR0741 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,176 $40,448 Not Implemented
OR0741 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,371 $0 Not Implemented
AM0824 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $700 $360 Implemented
AM0824 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,400 $1,855 Not Implemented
AM0824 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,660 $4,400 Implemented
MA0826 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $552 $250 Not Implemented