IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

844

matching recommendations
Reset
SIC 3672 Printed Circuit Boards
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0152 # 07 Y:1997 07 1997 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $32,500 $6,000 Not Implemented
HO0152 # 08 Y:1997 08 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $3,963 $1,500 Not Implemented
KU0462 # 01 Y:1996 01 1996 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $28,125 $359 Implemented
KU0462 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,852 $312 Implemented
KU0462 # 03 Y:1996 03 1996 TREAT AND REUSE RINSE WATERS $6,559 $3,041 Implemented
KU0462 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $5,219 $1,450 Implemented
KU0462 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,755 $205 Implemented
KU0462 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,934 $2,566 Implemented
KU0462 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $1,255 $299 Implemented
KU0462 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $393 $600 Not Implemented
KU0462 # 09 Y:1996 09 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $353 $42 Implemented
AS0175 # 01 Y:1996 01 1996 UPGRADE CONTROLS ON COMPRESSORS $3,647 $11,000 Not Implemented
AS0175 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,105 $6,800 Not Implemented
AS0175 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,925 $6,300 Implemented
AS0175 # 04 Y:1996 04 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,635 $25,000 Not Implemented
AS0175 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $1,625 $1,350 Implemented
AS0175 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,214 $21,652 Implemented
AS0175 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $237 $499 Implemented
AS0175 # 08 Y:1996 08 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $8,910 $1,200 Not Implemented
AS0167 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,627 $3,381 Implemented
AS0167 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $145 $137 Implemented
AS0167 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $938 $0 Implemented
AS0167 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $596 $560 Not Implemented
AS0167 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,634 $10,934 Implemented
AS0167 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $577 $975 Implemented